Home / Services / Wall Extensions & Partitions

Wall Extensions & Partition Walls

NVQ Level 2 Qualified · CSCS Blue Skilled Worker Card

We build and board non load bearing stud walls to split a room, create a new space or extend an existing wall. Framework is set out square and plumb, boarded, and finished so the new wall reads as part of the original property.

Every job is priced in writing before work begins, and the site is protected and cleared down when we are finished.

NVQ Level 2

Qualified in Plastering

CSCS Blue Card

Skilled Worker

Walls & Ceilings

Interior and exterior work

Free Quotations

No-obligation enquiries

What a partition wall is

A New Wall, Built to Look Like It Was Always There

A partition is a non load bearing wall built from a timber or metal framework, boarded on both faces and then finished. It carries its own weight and the weight of what is fixed to it, but it does not hold up the structure above.

It is how most rooms get divided, how a walk-in wardrobe or en-suite gets formed, and how an awkward layout gets corrected. The framework decides everything: if it is set out square and plumb, the finished wall looks original. If it is not, no amount of finishing will hide it.

Partition & Wall Services We Cover

From a single dividing wall through to reworking a full layout, these are the types of work carried out.

Timber Stud Partitions

Framework built from timber, set out at correct centres and fixed to floor, ceiling and adjoining walls.

Metal Stud Partitions

Metal framework where a lighter, straighter system suits the job better than timber.

Room Dividing Walls

One room split into two, including forming the new doorway and making good where the wall meets existing surfaces.

Wall Extensions & Build-Outs

Existing walls brought forward to square off a room, hide pipework or create depth for fittings.

Doorways & Openings Formed

New door openings framed and lined, or existing openings closed up and blended into the wall.

Boxing In & Bulkheads

Pipework, soil stacks, boilers and beams boxed in neatly so they stop dominating the room.

From prep to perfect finish

Our Partition Wall Process

A partition is a setting-out job before it is anything else. This is the order followed on every wall.
Step 1

Set Out & Protect

Floors are sheeted and the area cleared, then the wall line is marked out on the floor, transferred to the ceiling and checked plumb. Door positions, fixing points and any services in the way are agreed before anything is fixed.

Step 2

Build the Framework

Head and sole plates are fixed, then studs are set at correct centres with noggins added where boards will join and where heavy items are going. Openings are framed at this stage rather than cut in later.

Step 3

Board, Finish & Clean-Up

Both faces are boarded and fixed off, corner beads fitted, then the wall is taped and jointed or skimmed to the finish agreed. The site is cleared down and offcuts and waste taken away.

Why Choose Us for Partition Walls

Anyone can quote a job. These are the standards held on every project, whether it is one ceiling or an entire property.

Qualified Tradesman

NVQ Level 2 qualified in Plastering and a CSCS Blue Skilled Worker Card holder, so the person quoting the job is the trained tradesman carrying it out.

Clean, Protected Sites

Floors sheeted, sockets masked and furniture covered before anything starts, with waste taken away and the room swept before we leave.

Flat, Smooth Finishes

Every surface is left flat and ready for decoration, with no filling or making good needed first.

We Solve Complex Wall & Ceiling Issues

Most partition enquiries start with one of these situations. Each has a proper fix and each has a bodge. We only do the first.

Need an Extra Bedroom or Office?

A large room can be divided into two usable spaces, with the new doorway framed in and the finish blended so it does not look like an afterthought.

Open Plan Feeling Too Open?

A partition can bring back a defined space without closing the whole floor in, and it can be built partial height where that suits better.

Pipework, Boiler or Stack on Show?

Boxing in and bulkheads tidy away the things you do not want to look at, built square so they read as part of the room.

Doorway in the Wrong Place?

An existing opening can be closed up and a new one formed elsewhere in the same wall, then finished so the change does not show.

Wall Too Thin for Fixings?

Building a wall out gives you the depth for shelving, a wall-mounted TV or recessed fittings, with noggins built in where the load goes.

Sound Carrying Between Rooms?

Insulation can be built into the framework and the boarding specified accordingly. This is quoted as an addition so you can decide whether it is worth it.

Scope of work

What the Job Includes

Good to know

Quoted Separately

Recent projects

Our Partition Wall Work

A selection of completed jobs, photographed on the day of handover. Ask and we will send more examples of work like yours.

Partition Wall FAQ

Do I need permission to put up a partition wall?
A non load bearing partition in an existing room is usually straightforward, but requirements vary depending on what the new space is used for and how it affects things like escape routes, ventilation and light. Check with your local building control if you are unsure, and always check your lease if the property is leasehold.
Yes. We hold an NVQ Level 2 in Plastering and a CSCS Blue Skilled Worker Card. Both can be shown on request.
Removing a non load bearing partition and making good is straightforward. If the wall is holding something up, that is structural work and needs a structural engineer and building control, which sits outside what we do.
It is not always obvious, and it is not something to guess at. If there is any doubt, a structural engineer should confirm it before anything is touched.
Timber is the usual choice in homes and takes fixings easily. Metal is lighter, very straight and often suits longer runs or commercial work. We will recommend whichever suits your job and explain why.
Yes, provided the fixing lands on a stud or a noggin. Tell us at survey stage where heavy items are going and the framework can be built to suit.
We frame and line the opening ready for a door. Supplying and hanging the door itself, along with architrave and skirting, is normally handled by a joiner and is quoted separately.
Get in touch with your postcode and we will confirm whether your job is within our working area.
Related work

Often Booked Together

This work is frequently one part of a bigger job. These are the services it is most often combined with.

Plasterboard Installation

Dry lining and boarding to walls and ceilings across the rest of the property.

Skimming

The finishing coat that takes a newly boarded partition to a paint-ready surface.

Plastering

Full float and set where existing walls are being plastered at the same time.

Thinking about a boarding job?

Get in touch for a free, no-obligation quotation.
Get in touch

Request Your Free
Quotation

Tell us the rooms, rough sizes and current condition, and send a couple of photos if you have them. We will come back to you with a written quotation.
Phone

Send an Enquiry

We aim to respond to every enquiry as quickly as possible.